This flume, constructed over period of 2 years with 1.8 million feet of lumber, conveyed 80 million gallons of water per day to placer gold deposits. It is attached to the Dolores and San Miguel Canyon walls.
Hanging Flume
This flume, constructed over period of 2 years with 1.8 million feet of lumber, conveyed 80 million gallons of water per day to placer gold deposits. It is attached to the Dolores and San Miguel Canyon walls.